Smith Farm – Hoover, Alabama
In a new commercial development, adaptive outlet strategy reduced required detention volume by approximately 30%, reducing excavation depth while maintaining downstream discharge targets
District 31 – Alabaster, AL
The District 31 retrofit replaced conventional outlets in three existing ponds with automated outlet structures (AOS).
By dynamically matching real rainfall and storage conditions, the retrofit improved discharge timing, reduced peak water surface elevations, and enhanced post-storm drawdown efficiency—without expanding pond footprints.
